July 2009

Preferred Options Report

This report summarises the work carried out in developing a number of Route Options to enable a Preferred Route to be identified to be taken forward for development of the draft Orders and the preparation of the Environmental Statement.

A more detailed assessment of the lands within the Preferred Corridor was undertaken to identify a number of alternative route options which were assessed against the key criteria of Safety, Economics, Environment, Integration and Accessibility.